Jlg 4017 Platform Operator Manual Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Maquinaria especial Jlg 4017 Platform Operator Manual. JLG 4017 Platform Operator Manual User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Operator & Safety

Operator & SafetyManualKeep this manual with machine at all times.Platformfor3513, 4013& 401731200029RevisedFebruary 27, 2006

Página 2

Section 1 - General Safety Practices1-2312000291.3 OPERATION SAFETYElectrical Hazards• This machine is not insulated and does not provide protection f

Página 3 - REVISION LOG

Section 1 - General Safety Practices1-331200029Tip Over Hazard• DO NOT exceed rated lift capacity. Distribute loads evenly on platform floor.• Be sure

Página 4 - Read This First

Section 1 - General Safety Practices1-431200029Load Falling Hazard• Never suspend load from platform or supports.• DO NOT carry materials directly on

Página 5

Section 1 - General Safety Practices1-531200029Lifting Personnel• USE ONLY a JLG manufactured personnel work platform.• DO NOT drive machine from cab

Página 6

Section 1 - General Safety Practices1-631200029Pinch Points and Crush HazardsStay clear of pinch points and rotating parts on the telehandler.• Stay c

Página 7 - TABLE OF CONTENTS

Section 1 - General Safety Practices1-731200029• Keep arms and hands clear of attachment tilt cylinder.• During operation, keep all body parts inside

Página 8 - Table of Contents

Section 1 - General Safety Practices1-831200029Fall Hazard• During operation, occupants in the platform must wear a full body harness with alanyard at

Página 9 - 1.1 GENERAL PRECAUTIONS

Section 1 - General Safety Practices1-931200029Chemical HazardsExhaust Fumes• DO NOT operate machine in an enclosed area without proper ventilation.•

Página 10 - Electrical Hazards

Section 1 - General Safety Practices1-1031200029This Page Intentionally Left Blank

Página 11 - 12.5 m/s MAX

Section 2 - Pre-Operation and Controls2-131200029SECTION 2 - PRE-OPERATION AND CONTROLS2.1 PRE-OPERATION CHECKS & INSPECTIONNote: Complete all re

Página 13 - Lifting Personnel

Section 2 - Pre-Operation and Controls2-231200029Begin your platform walk-around inspection at item 1, as noted below. Continue toyour right (counterc

Página 14 - 31200029

Section 2 - Pre-Operation and Controls2-3312000292.2 SAFETY DECALSEnsure all DANGER, WARNING, CAUTION and instructional decals and propercapacity ch

Página 15

Section 2 - Pre-Operation and Controls2-431200029OZ178017066041706604A17066041706604A170660417066031706602A17066021706604A

Página 16 - Fall Hazard

Section 2 - Pre-Operation and Controls2-531200029OZ1790170150917015091704277 B1704277P/NAERIAL PLATFORMS/NMODELProducer:Industrieterrein Oude Bunders

Página 17 - Chemical Hazards

Section 2 - Pre-Operation and Controls2-6312000292.3 CONTROLS1. Emergency Stop Button: Push in to shut off power to platform controls and stop engine.

Página 18

Section 2 - Pre-Operation and Controls2-731200029Ignition•Position 0 - Engine off•Position IGN - Voltage is available for all electrical functions.•Po

Página 19

Section 2 - Pre-Operation and Controls2-831200029JoystickThe joystick (1) controls the boom and attachment functions.Note: Buttons (5) & (6) are

Página 20

Section 2 - Pre-Operation and Controls2-931200029Platform Functions• Platform tilt is enabled by button (2) and controlled by the rocker switch (3). P

Página 21 - 2.2 SAFETY DECALS

Section 2 - Pre-Operation and Controls2-1031200029Indicator Panels1. Engine Temperature: Illuminates red when engine temperature is high.2. Battery Ch

Página 22

Section 2 - Pre-Operation and Controls2-11312000299. System Distress Indicator:a. Flashes yellow and buzzer sounds intermittently when pressure is low

Página 23

Revision Loga31200029Revision LogREVISION LOGOctober 3, 2005 - A - Original Issue of ManualFebruary 27, 2006 - B - Added 4017 information.

Página 24 - 2.3 CONTROLS

Section 2 - Pre-Operation and Controls2-12312000292.4 PLATFORM GATEKeep gate clean and unobstructed.• Pull the black hook (1) away from the gate and p

Página 25 - Ignition

Section 2 - Pre-Operation and Controls2-13312000292.5 LANYARD ANCHORAGE POINTS• Attach lanyard to one of the lanyard anchorage points (2).• Only attac

Página 26 - Joystick

Section 2 - Pre-Operation and Controls2-1431200029This Page Intentionally Left Blank

Página 27

Section 3 - Operation3-131200029SECTION 3 - OPERATION3.1 WARM-UP AND OPERATIONAL CHECKSThis section outlines the checks to be performed at the beginni

Página 28 - Indicator Panels

Section 3 - Operation3-2312000293.2 ENGINEStarting the EngineThis machine can be operated in temperatures of -20°C to 40°C (0°F to 104°F).Consult JLG

Página 29

Section 3 - Operation3-331200029Normal Engine Operation• Observe indicator panels frequently to be sure all engine systems are functioningproperly.• B

Página 30 - 2.4 PLATFORM GATE

Section 3 - Operation3-4312000293.3 PLATFORM OPERATION• After engine start-up from the platform is successful, activate the footswitch toenable the pl

Página 31 - 2.5 LANYARD ANCHORAGE POINTS

Section 3 - Operation3-5312000293.4 LOADING AND SECURING FOR TRANSPORT1. To move/load the platform when detached from telehandler, use fork slots loca

Página 32

Section 3 - Operation3-631200029This Page Intentionally Left Blank

Página 33 - SECTION 3 - OPERATION

Section 4 - Platform4-131200029SECTION 4 - PLATFORM4.1 APPROVED PLATFORMSTo determine if platform is approved for use on the specific telehandler you

Página 34 - Section 3 - Operation

Read This Firstb31200029Read This FirstThis manual is a very important tool! Keep it with the machine at all times.The purpose of this manual is to pr

Página 35

Section 4 - Platform4-2312000294.3 TELEHANDLER/PLATFORM CAPACITYPrior to installing the platform verify it is approved (see page 4-1) and thetelehandl

Página 36

Section 4 - Platform4-3312000294.4 PLATFORM INSTALLATIONVerify the platform is properly installed.Refer to the Operator & Safety Manual supplied w

Página 37

Section 4 - Platform4-431200029Mechanical Quick-Switch DeviceAttachment pin engaged in platform pin recess andlock pin inserted and secured with retai

Página 38

Section 5 - Emergency Procedures5-131200029SECTION 5 - EMERGENCY PROCEDURES5.1 EMERGENCY OPERATIONOperator Unable to Control MachineIf the platform op

Página 39 - SECTION 4 - PLATFORM

Section 5 - Emergency Procedures5-2312000295.2 EMERGENCY LOWERING OF BOOMIn case of an emergency, engine or hydraulic failure an emergency recovery sy

Página 40 - Section 4 - Platform

Section 5 - Emergency Procedures5-3312000295.3 INCIDENT NOTIFICATIONJLG Industries, Inc. must be notified immediately of any incident involving a JLGp

Página 41

Section 5 - Emergency Procedures5-431200029This Page Intentionally Left Blank

Página 42

Section 6 - Lubrication & Maintenance6-131200029SECTION 6 - LUBRICATION & MAINTENANCE6.1 INTRODUCTIONService the product in accordance with Se

Página 43 - 5.1 EMERGENCY OPERATION

Section 6 - Lubrication & Maintenance6-2312000296.3 SERVICE & MAINTENANCE SCHEDULES8 Hour Maintenance ScheduleOZ1572Check FuelLevelCheckBatter

Página 44 - Platform ERS

Section 6 - Lubrication & Maintenance6-3312000296.4 OPERATOR MAINTENANCE INSTRUCTIONSFuel SystemA. Fuel Level Check1. Check fuel gauge (1) located

Página 45 - 5.3 INCIDENT NOTIFICATION

Read This Firstc31200029This product must comply with all safety related bulletins. Contact JLG Industries,Inc. or the local authorized JLG representa

Página 46

Section 6 - Lubrication & Maintenance6-431200029TiresA. Tire Air Pressure Check1. Perform “Shut-Down Procedure” on page 3-3.2. Remove valve stem c

Página 47 - Clothing and Safety Gear

Section 6 - Lubrication & Maintenance6-531200029BatteryA. Battery Check1. Perform “Shut-Down Procedure” on page 3-3.2. Open the engine cover.3. We

Página 48 - 8 Hour Maintenance Schedule

Section 6 - Lubrication & Maintenance6-631200029This Page Intentionally Left Blank

Página 49 - Fuel System

Section 7 - Additional Checks7-131200029SECTION 7 - ADDITIONAL CHECKS7.1 EMERGENCY RECOVERY SYSTEM TESTThe Emergency Recovery System (ERS) is availabl

Página 50

Section 7 - Additional Checks7-2312000297.2 LIMITED BOOM EXTENSION SWITCH TESTAustralian machines are equipped with a switch (1) on the boom to limit

Página 51

Section 8 - Specifications8-131200029SECTION 8 - SPECIFICATIONS8.1 PRODUCT SPECIFICATIONSFor telehandler specifications refer to the Operator & Sa

Página 52

Section 8 - Specifications8-231200029This Page Intentionally Left Blank

Página 53 - SECTION 7 - ADDITIONAL CHECKS

Index131200029AAdditional Checks... 7-1Approved Platforms... 4-1BBattery Check...

Página 54 - Section 7 - Additional Checks

Index231200029TTip Over Hazard ... 1-3Tire Pressure... 6-4VVibration ...

Página 55 - SECTION 8 - SPECIFICATIONS

Inspection, Maintenance & Repair Log131200129Serial Number ______________________________Date CommentsInspection, Maintenance & Repair Log

Página 56 - Section 8 - Specifications

Read This Firstd31200029This Page Intentionally Left Blank

Página 57

Inspection, Maintenance & Repair Log231200129Date Comments

Página 58

JLG Industries, Inc.TRANSFER OF OWNERSHIPTo: JLG, Gradall, Lull and SkyTrak product owner:If you now own but ARE NOT the original purchaser of the pro

Página 61 - TRANSFER OF OWNERSHIP

JLG Worldwide LocationsCorporate OfficeJLG Industries, Inc.1 JLG DriveMcConnellsburg PA. 17233-9533USAPhone: (717) 485-5161Customer Support Toll Free:

Página 62

Table of Contentsi31200029TABLE OF CONTENTSRevision LogRead This FirstOperator Qualifications ... b

Página 63

Table of Contentsii 31200029Section 4 - Platform4.1 Approved Platforms..... 4-14.2 Unapproved

Página 64 - JLG Worldwide Locations

Section 1 - General Safety Practices1-131200029SECTION 1 - GENERAL SAFETY PRACTICES1.1 GENERAL PRECAUTIONS• DO NOT use the machine with platform attac

Comentários a estes Manuais

Sem comentários